Full height metal clad - <9m Springing ht, <35m Spans, 150th Floor, 4 tonne Post-load, 3.0 tonne Fork, EXCL Sprinklers
2.1m high precast & metal cladding above - <9m Springing ht, <35m Spans, 150th Floor, 4 tonne Post-load, 3.0 tonne Fork, EXCL Sprinklers
Full height precast panels - <9m Springing ht, <35m Spans, 150th Floor, 4 tonne Post-load, 3.0 tonne Fork, EXCL Sprinklers
Single Level: A Grade, Office facade (Precast Panels+Alucobond+Glazing+Sunscreens) incl. Entry Canopy, Carpet, FH wall tiles(Wet), HVAC, Recept, Amenities core, Mtg, IT room, Exec Offices, Mainly open plan EXCL Sprinklers
Double Level: A Grade, Office facade (Precast Panels+Alucobond+Glazing+Sunscreens) incl. Entry Canopy, Susp slab, SS handrail, carpet, FH wall tiles(Wet), HVAC, Recept, 2*Amenities core, Mtg, IT room, Exec Offices, Mainly open plan EXCL Sprinklers
Single Level: B Grade, Office facade (Precast Panels+"punch-out" Glazing+FH glazed Entry) incl. Entry Canopy, carpet, Splashbacks wall tiles(Wet), HVAC, Recept, Amenities core, Mtg, Exec Offices, Mainly open plan EXCL Sprinklers
Double Level: B Grade, Office facade (FH P conc+"punch-out" Glazing+FH glazed Entry) incl. Entry Canopy, Susp slab, SS handrail, Splashbacks wall tiles(Wet), HVAC, Recept, 2*Amenities core, Mtg, Exec Offices, Mainly open plan EXCL Sprinklers
OR